02 Jun 2026 · 3 min read

400 tickets, two lost years, nine months to recover

How release governance brought a frozen John Hancock platform program back to life.

In short

A platform frozen for two years moving again: 400+ backlog tickets cleared in nine months and five modernization initiatives live across 20+ business divisions.

In September 2022 I moved to Boston to work on-site for John Hancock as Release Train Engineer and Technical Product Manager. The program I joined had been held up for two years.

COVID had put the platform on hold. When work restarted, the backlog was still there, only larger. More than 400 tickets were waiting, and the roadmap had broken into pieces that no longer fit together.

Where do you even start?

Not with the tickets. With the way work moved through the system.

My starting point was release governance: how work was planned, sequenced and released. A backlog that size is not a to-do list; it’s a symptom. If the release process can’t absorb work, adding more people only adds more queue.

Then capacity. I introduced structured capacity planning with Function Point analysis, so we planned against what the teams could really deliver, not what we hoped they could. Within the first quarter, effort estimates were landing within 10% of actual work, and overtime and idle time both came down.

Scaling once it moved

Once the train was moving, the business wanted more, and rightly so. We guided teams through coordinated upgrades, and all five modernization initiatives went live across more than 20 business divisions. That only works when dependencies are visible and release dates mean something.

The AWD workflow system at the heart of it was still on its 2019 release. My teams worked in AWD’s legacy desktop clients, EnCorr and Viewstation. We delivered the platform’s first upgrades in four years, completing most of them by Q2 2023, within a year of taking over, while still clearing the backlog.

From AWD to SS&C Chorus BPM

AWD began at DST Systems. After SS&C acquired DST, SS&C relaunched AWD as Chorus BPM, the workflow core of its SS&C Chorus automation platform, which now sits alongside Blue Prism’s automation under SS&C Blue Prism. So moving from AWD to Chorus BPM isn’t a switch to a different product. It’s the same platform’s current generation.

Upgrading inside AWD was the first step. The bigger one was moving people onto the new generation. Before I handed over in August 2025, all my teams had moved off the EnCorr and Viewstation desktops and onto SS&C Chorus BPM. A change like that touches how every person works every day, so it needs the same discipline as any release: clear dates, training before go-live and no surprises for the business.

The outcome

  • 400+ tickets cleared in 9 months on a program that had been stalled for two years.
  • All 5 modernization initiatives live across 20+ business divisions.
  • Effort estimates within 10% of actual work in the first quarter.
  • The AWD workflow system’s first upgrades since 2019, mostly complete by Q2 2023.
  • All my teams moved from AWD’s legacy EnCorr and Viewstation desktops to SS&C Chorus BPM before I handed over in August 2025.

What I learned in Boston

A stalled program is rarely a people problem. It’s usually a flow problem that has turned into a morale problem. Fix the flow, make progress visible, and people start believing in the plan again. That belief is what really clears a backlog.

Have a program that’s stuck? This is the kind of turnaround I enjoy most. Get in touch.